HSSG
HSSG offers a comprehensive range of services for large scale foundation projects throughout the region. HSSG is renowned for providing technically advanced and cost effective foundation solutions to its Clients.
The Company grew rapidly and steadily reaching more than 120 completed high profile projects in diverse fields such as roads and bridges, bespoke residential and commercial buildings in Dubai and Abu Dhabi especially, luxurious five star hotels in Qatar and the United Arab Emirates, airports, medical, cultural and educational facilities, a power plant in the Kingdom of Saudi Arabia, port infrastructures in Sohar Oman, and more recently public transport with the building of the Chennai metro, all completed in the last 12 years. Today the number of employees exceeds 1,000 people making HSSG one of the leading ground engineering companies in the Middle East.
From the first project, HSSG’s experienced and dedicated team has been committed to delivering exceptional performance of the latest equipment to ensure safe and efficient operation on construction sites. HSSG is an ISO (9001, 14001 and OHSAS 18001) certified company, enforcing the highest standards of safety for its people, operation and material.
Royal Atlantis Hotel
Piling Works
The Royal Atlantis Resort and Residences is a mega project that comprises a hotel and residences. It encompasses 43 storeys and will culminate at a height of 185 meters above sea-level, while the residential tower will reach 37 storeys (165 meters above sea-level).
HSSG’s scope of work on the project includes all piling works for the foundations ranging from 750mm to 1500mm diameter piles. A total of 2282 nos of piles were constructed with depths up to 45m. The project further included sheet piling works for all the six cores which were constructed with a total length of 992m.
JUMEIRAH BEACH RESIDENCE
SECTOR 4 & 6, DUBAI
Piling Works
Jumeirah Beach Residence (also known as JBR) is a 1.7 kilometres long, 2 square kilometres (0.77 sq mi) gross floor area waterfront community located against the Persian Gulf in Dubai Marina. It is a residential development and contains 40 towers (35 are residential and 5 are hotels). JBR can accommodate about 15,000 people, living in its apartments and hotel rooms.
HSSG’s scope of work on the project includes all piling works for the foundations ranging from 900mm to 1200mm diameter piles. A total of 2703 nos of piles were constructed with depths upto 48m. The total piling length is 100,000m.
Client : Public Works Authority
Contractor: Impregilo – Rizzani de Eccher JV
Completion Date : 10 May 2004
SHEIKH ZAYED GRAND MOSQUE
ABU DHABI, UNITED ARAB EMIRATES – Piling Works
The project was launched by the late president of the United Arab Emirates (UAE), Sheikh Zayed bin Sultan Al Nahyan, who wanted to establish a structure that would unite the cultural diversity of the Islamic world with the historical and modern values of architecture and art. His final resting place is located on the grounds adjacent to the complex.
HSSG’s scope of work on the project includes all piling works for the foundations ranging from 600mm to 1500mm diameter piles. A total of 5,314 nos of piles were constructed with depths upto 27m. The total piling length is 120,000m.
CAPITAL GATE, ABU DHABI, UNITED ARAB EMIRATES
Shoring and Piling works
Capital Gate, also known as the Leaning Tower of Abu Dhabi, is a skyscraper in Abu Dhabi that is over 160 meters (520 ft) tall, 35 stories high, with over 16,000 square meters (170,000 sq ft) of usable office space. Capital Gate is one of the tallest buildings in the city and was designed to incline 18° west. The building is owned and was developed by the Abu Dhabi National Exhibitions Company. The tower is the focal point of Capital Centre.
HSSG’s scope of work on the project includes the diaphragm wall shoring system and all piling works for the foundations ranging from 600mm to 1000mm diameter piles. A total of 478 nos of piles were constructed with depths upto 35m. The total piling length is 10,000m and retaining depth of the shoring is 18m.
Dr. SULAIMAN AL HABIB MEDICAL CITY, AL KHOBAR, KINGDOM OF SAUDI ARABIA
Shoring & Piling Works
Dr. Sulaiman Al-Habib Hospital in AL Khobar is the first fully integrated digital health project with Digital Hospital system in the region, with the capacity of 400 beds and 290 clinics on 290.000 m2. The hospital will work on applying virtual healthcare system (Cyber Care) so as to provide diagnostic and therapeutic services for multiple categories of patients depending on the remote healthcare (VCare) via advanced digital and technological systems.
HSSG’s scope of work on the project includes the secant wall shoring system and all piling works for the foundations ranging from 800mm to 1200mm diameter piles. A total of 2,037 nos of piles were constructed with depths up to 25m. The total piling length is 35,000m and retaining depth of the shoring is 10m.
QATAR INTEGRATED RAILWAY PROJECT – GOLD LINE UNDERGROUND, DOHA – QATAR
The Doha Metro in Qatar’s capital city is one of the most advanced rail transit systems in the world. It has three lines with an approximate overall length of 300 km and 37 stations. It is built over two phases: the first phase is the Red, Gold, and Green lines opened in 2019, with 37 stations. The second phase involves the introduction of an additional line (Blue) and the expansion of the existing ones, with more than 60 additional stations.
HSSG’s scope of work on the project includes all contiguous piling works for with 800mm diameter piles. Also foundation piles with diameters ranging from 600mm – 1000mm were constructed with depths upto 40m.
Client : Katara Hospitality
Contractor : HSSG Foundation Contracting LLC
Completion Date : 15 January 2015
LUSAIL KATARA HOTEL
LUSAIL – DOHA, QATAR
Lusail Katara Hotel – Enabling & Piling Works
Symbolically intertwined with Qatar’s heritage, the iconic towers design is an architectural translation inspired by the seal of Qatar. This property is set to become the hospitality landmark in Lusail. The crossed swords of the country’s seal have been architecturally translated into twin arched towers that rise gracefully from the podium level, while the landscaped gardens and palm trees reflect in the ocean frontage.
Read More
HSSG’s scope of work on the project includes shoring, excavation, dewatering, piling and pile testing. Piling works for the foundations comprise of 1000mm diameter piles. A total of 2067 nos of piles were constructed with depths upto 35m. The total piling length is 50,000m. For the shoring system, a combination of 800mm secant piles and 1500mm thick diaphragm wall has been constructed with retaining depths upto 10m.
Less
MANDARIN ORIENTAL HOTEL & APARTMENTS MUSCAT, SULTANATE OF OMAN
Mandarin Oriental Hotel & Apartments – Enabling Works
The Mandarin Oriental, Muscat, is located on the coast of the prestigious Shatti Al Qurum district. The Residences at Mandarin Oriental will represent Oman’s first luxury, branded beachfront residences, introducing unprecedented levels of sophistication and service. Residents will also benefit from the Mandarin Oriental Hotel amenities, including five dining venues and bars, signature spa, outdoor swimming pool, one-of-kind ballroom, and a variety of banquet and meeting spaces.
Read More
The Mandarin Oriental, Muscat will introduce an entirely new concept of luxury living to Oman. With exquisite interiors, unparalleled sea views and iconic opulence, this new development is set to become a waterfront sanctuary right in the heart of the dynamic Muscat city.
HSSG’s scope of work on the project includes all shoring, excavation, dewatering, piling and pile testing works. The shoring system consists of 800mm secant piled wall with retaining depths upto 10m for 805 running meters . Piles are ranging from 750mm to 1000mm diameter piles with depths upto 25m.
Less
Project Photos
Know more about HSSG & their work
Contact Us
Tel: +971 4 453 4799
Fax: +971 4 453 4797
Email: info@hssg.com
Location
Damac Executive Heights,
9th Floor, Office 906, P.O. Box 50774
Tecom, Al Barsha, Dubai, United Arab Emirates